Projects

This project consists of two major components.

1. Intake Structure

A concrete intake structure was installed in the lake using a coffer dam. The structure has six intake locations with a knife gate to control the intake at each location.

2. Pump Station

The Pump Station has 8.5m deep wet well that has 2 intake chambers and 2 pump wells. The building is made of structural steel with insulated metal panels. There are 4’ high lift pumps that will pump water to the K+S Potash Mine

Client Name:
SaskWater

Consultant:
Associated Engineering

Delivery Method:
Fixed Price

Project Value:
$16.8 M.

Location:
Buffalo Pound, Saskatchewan

Project Type:
Water-Wastewater