Scope of work on this project includes construction and commissioning of a new 138 kV electrical substation which includes installation of two 72/138 kV – 4160 V power transformers, 1460 V switchgear and distribution equipment, connection of new electrical power supply to the existing facility electrical system, 3 new 2000 kW backup power diesel generators including diesel fuel supply system, PLC programming for generators and switchgear, and modifications to the existing facilities to incorporate new structures, systems and ancillary equipment to existing elements.

Client Name:
Buffalo Pound Water Treatment Corporation

Consultant:
AECOM Canada Ltd.

Delivery Method:
Stipulated Price

Project Value:
$16.7M

Location:
Buffalo Pound, SK