This project consists of two major components.  The first is a concrete intake structure installed in the lake using a cofferdam.  The structure has six intake locations, each with a knife gate to control the intake.  The second component is a pump station which has an 8.5 m deep wet well with two intake chambers and two pump wells.  The pump station building is constructed of structural steel with insulated metals panels and has four high lift 600 hp pumps to transfer water to the K + S Potash Mine.  

Client Name:
SaskWater

Consultant:
Associated Engineering

Delivery Method:
Fixed Price

Project Value:
$16.4M

Location:
Buffalo Pound, Saskatchewan