Projects

  • 850 ft2 masonry building
  • 83 m3 wet well and 421 m3 pump well
  • 160 HP wastewater pumps
  • 450 mm diameter HDPE gravity sewage line
  • Odour control unit
  • Demolition and full commissioning of the new pump station
  • Concrete reservoir
  • Concrete walls and main floor slab completed through the winter season

Client Name:
City of Melville

Consultant:
Associated Engineering (Sask) Ltd.

Delivery Method:
Stipulated Price

Project Value:
$5.3M

Location:
Melville, SK