- Renovation of all office space in the existing CBC building
- New basement concrete slab requiring reinforcing and underpinning of the existing structure due to high loading requirements of the storage materials
- Creation of a public function/viewing area
- Specialized Vortex fire suppression system utilizing nitrogen as a fire protection method which included tie-ins to the existing fire protection system
- Asbestos and lead abatement
Client Name:
Government of Saskatchewan
Consultant:
SEPW Architecture Inc.
Delivery Method:
Construction Management
Project Value:
$8.2M
Location:
Regina, SK