  • New 130,000 ft2 joint-use French Immersion and English K-8 facility
  • Poured structural concrete slab on grade on the main floor
  • Structural steel framework with poured concrete on metal decking at the 2nd floor
  • Exterior envelope of metal cladding, brick, and split faced coloured concrete block
  • In-slab heating and cooling lines
  • Coloured glass exterior windows
  • Certified LEED Silver



Client Name:
Chinook School Division and Holy & Trinity Catholic School Division

Consultant:
aodbt architecture + interior design & Stantec Architecture

Delivery Method:
Stipulated Sum

Project Value:
$43.8M

Location:
Swift Current, SK