- New 130,000 ft2 joint-use French Immersion and English K-8 facility
- Poured structural concrete slab on grade on the main floor
- Structural steel framework with poured concrete on metal decking at the 2nd floor
- Exterior envelope of metal cladding, brick, and split faced coloured concrete block
- In-slab heating and cooling lines
- Coloured glass exterior windows
- Certified LEED Silver
Client Name:
Chinook School Division and Holy & Trinity Catholic School Division
Consultant:
aodbt architecture + interior design & Stantec Architecture
Delivery Method:
Stipulated Sum
Project Value:
$43.8M
Location:
Swift Current, SK